Valley Pivot Tower Box Wiring Diagram
This single span pivot is driven by water pressure and offers all of the structural and mechanical advantages of any valley center pivot.
Valley pivot tower box wiring diagram. Use a wire nut to connect our blue black wire to the valley purple percent timer wire that was removed from the terminal strip in step 4. Direct pivot parts provides replacement pivot irrigation parts for all major brands but is not directly associated with lindsay zimmatic reinke valley olson lockwood nebraska irrigation or any other pivot manufacturer. Valley structures are proven to stand up to the toughest loads produced by rough terrain deep furrows and long span machines. Last tower box w booster pump 6 96 5 31 booster pump box mod.
5 diameter pipeline. For more than 60 years valley center pivot irrigation equipment has earned its reputation as the most trusted brand in the industry. Standard pivot box 11 wire pivot panel csa parts list. Basic enhanced wiring on valley pivots.
Small field pivot point 5000 series span owner s manual. Electrical system schematic decal. 1 sign zimmatic by lindsay pivot to the third step as shown in the diagram. Remove the valley pink end gun wire from the terminal strip in the end tower box span cable side and install our brown wire in its place.
Single span linear owner s manual. Hydrus valley style stall tower box forward 3 1 y reverse time delay y safety in4 forwardyellow a15 g hydrus valley style end tower box 10 wire reversepink end tower m relay no gree n white brown re d ora nge ora nge blue motor 480v l1 2 l3 12 11 10 9 8 7 3 2 1 ds 1 3 timer hour volt meter n 0 0 c c transformer 3 amp ccmr 3 amp ccmr g r r. Remove the valley yellow safety wire from the terminal strip in the end tower box span cable wire coming from the center and install our black wire and red black stripe wire in its place. Small field pivot point 8120 series span owner s manual.
Spinner drive owner s manual. I am putting up an old zimm pivot and adding a gen 2 span in the my wiring diagrams show the gray or tan wire running through all the. From pivot point to last span valley engineers constructs and field tests each center pivot. Use a wire nut to connect our red wire to the valley yellow safety wire that was removed from.